Vertical Transportation

Izrada idejnog i glavnog projekta isklopive žičare na lokalitetu Hajla i Štedim, Rožaje, Crna Gora | Design&QC
Preliminary and Main Design of a Detachable Chairlift at the “Hajla and Štedim” Location in Rožaje, Montenegro
Idejni projekat izgradnje žičare za povezivanje Kulen Vakufa sa srednjovjekovnim gradom Ostrovica u Nacionalnom parku Una | Design&QC
Preliminary Design for the Construction of a Chairlift Connecting Kulen Vakuf to the Medieval Fortress Ostrovica in Una National Park
Izrada glavnog i izvedbenog projekta rekonstrukcije žičare Radeševo na RSTC Platak, uključujući novi krak žičare – krak 2 | Design&QC
Main and Detailed Design for the Reconstruction of the Radeševo Chairlift at RSTC Platak (Regional Sports, Recreation, and Tourist Center Platak)
Relokacija fiksne četverosjedne žičare na Bjelašnici – sistem vertikalnog transporta ski lifta | Design&QC
Relocation of the Fixed Quad Chairlift on Bjelašnica, Bosnia and Herzegovina
Isklopiva šestosjedna žičara na Bjelašnici – transportni sistem visokog kapaciteta i sigurnosti | Design&QC
Main Design of the Detachable Six-Seater Chairlift SBK6 on Bjelašnica

In addition to the highlighted projects, we have a series of other successfully completed collaborations that demonstrate the consistency, quality, and professional approach in our work. Below is an overview of additional references that further confirm our experience and dedication to every client.

VERTICAL TRANSPORT

  • Design and construction of vertical transport with a snowmaking system on Bjelašnica – Detachable six-seater chairlift Bjelašnica
  • Main design for part of slope 5a – Bjelašnica and main design for part of the Nordic skiing trail – Veliko Polje, Igman
  • Development of conceptual and main project for a detachable chairlift at the “Hajla and Štedim” site in Rožaje, including conceptual ski slope design and as-built project documentation
  • Development of the preliminary design: Construction of a detachable gondola cabin lift GLD8 “Hrasnica”, Hrasnica – Veliko Polje (Igman), including terrain geodetic surveys
  • Preparation of technical specifications (feasibility study) for the relocation of the quad chairlift on Bjelašnica
  • Preparation of technical documentation for the preliminary design of a chairlift connecting Kulen Vakuf with the medieval fortress Ostrovica in Una National Park
  • Main design for the relocation of the quad chairlift to a new location
Preliminary and Main Design of a Detachable Chairlift at the “Hajla and Štedim” Location in Rožaje, Montenegro

The planned chairlift system is a detachable six-seater. The construction of the chairlift as part of the future ski center is intended to serve as the foundation and driving force for the development of a mountain resort. The planned chairlift is a CLD6 type with a horizontal length of 1,321.80 meters and an elevation difference of 381 meters. The chairlift consists of a departure station and an arrival station. The departure station serves as the tensioning station, while the arrival station functions as the drive station. The drive station is located at the arrival station, which is considered the standard position for the drive station. This choice also helps reduce electrical energy consumption. The project includes several components: access plateau, departure station, garage and control cabin, arrival station, control cabin and electrical room and support towers.

Preliminary Design for the Construction of a Chairlift Connecting Kulen Vakuf to the Medieval Fortress Ostrovica in Una National Park

The preliminary design defined the main building, which includes an operational/manipulation area, a service room with a generator, a waiting area, and an information desk. In addition to the main building, the design also specified the reception building and landscaping solutions for both structures. Based on the project brief, the chairlift was calculated and the optimal components were designed. The chairlift consists of a lower and upper station, 5 support towers and 4 passenger cabins.

Main and Detailed Design for the Reconstruction of the Radeševo Chairlift at RSTC Platak (Regional Sports, Recreation, and Tourist Center Platak)

The project includes the construction of a new branch (Branch 2) of the existing chairlift. The newly designed chairlift features a lower drive station and an upper turnaround station, with no intermediate stations.

Branch 2 of the chairlift consists of:

  • The lower station (Building 2), serving as the loading and unloading station, as well as the drive and tensioning station, equipped with a control center (Building 1), a platform, and access road.
  • The upper station (Building 3), serving as the unloading and loading turnaround station, with its own control center (Building 4), a platform, and connection to the Radeševo 2 ski slope.
  • Chairlift towers with sheave assemblies and access platforms.
  • Access roads to the towers where access from existing ski slopes is not possible.
  • Steel cable and four-seat chairs.
  • Safety equipment.
Relocation of the Fixed Quad Chairlift on Bjelašnica, Bosnia and Herzegovina

The fixed quad chairlift was originally constructed at the Međustanica – Bjelašnica Peak location in 2017. Due to its unfavorable geographic position and strong winds reaching speeds of up to 150 km/h, as well as heavy snowfall and icing conditions, the chairlift’s operation was frequently disrupted. For this reason, the Client decided to relocate it. Since the quad chairlift at its current location could not be used at full capacity, moving it to a new site would increase the vertical transport capacity and significantly contribute to the development of the ski resort.

This project involves the vertical transport system of the quad chairlift along the ski lift BY route, with a capacity of 600 persons per hour.

The new quad chairlift location, including both old and new associated components, consists of:

  • The lower station of the chairlift, which functions as a loading/unloading and turnaround station, with a platform and connection to the ski slope;
  • The upper station of the chairlift, serving as a loading/unloading, drive, and tension station, equipped with a control center, platform, and access;
  • Chairlift towers with sheave assemblies, ladders, and access platforms;
  • Steel cable and chairs (quad);
  • Safety devices.

By constructing/relocating the four-seater chairlift to a new location, the lift will gain greater capacity for transporting passengers/skiers on the ski slope. To facilitate easier boarding and disembarking of skiers, a conveyor belt is planned just before passenger loading, serving as a pre-acceleration system.

Main Design of the Detachable Six-Seater Chairlift SBK6 on Bjelašnica

The chairlift system is a detachable six-seater. The detachable six-seater chairlift replaced the existing three-seater chairlift. The departure station is positioned at the existing departure station of the three-seater, while the arrival station is located at the intermediate station, both of which are larger in size compared to the three-seater stations.

The detachable chairlift is a high-capacity transport system that moves passengers from one location to another with full comfort and safety. The detachable six-seater serves to transport passengers from Babin Do to Međustanica. Its technical specifications have been tailored to meet the Client’s requirements. The design and installation were carried out according to the highest safety standards worldwide.

Chairlift Specifications

  • Operation: summer / winter
  • Cable speed: 5.5 m/s
  • Travel time: 6 minutes 13 seconds
  • 100% transport capacity: 1,800 people/hour
  • Number of vehicles/chairs at 100% capacity: 65 chairs
  • Distance between vehicles at 100% capacity: 65.3 meters
  • Load direction: 100% uphill / 25% downhill
“Terrain Stability of Sarajevo Canton” – Phase I

This project includes:

  • Updating and revising data on terrain stability in the urban area of Sarajevo Canton based on field investigations and orthophoto imagery – identification of changes in terrain stability during the period 2010–2024.
  • Development of an integrated purpose-built study with a GIS database for spatial planning and environmental protection needs.
  • Collection, organization, analysis, and synthesis of results from all previous geological and geotechnical investigations and tests conducted within Sarajevo Canton, as well as new field research.
  • Verification of terrain stability in the urban area using satellite radar imagery and application of advanced radar interferometry techniques – InSAR.


As a result of this project, a revised and comprehensive set of information was produced, covering landslide locations, terrain susceptibility to sliding, terrain stability categories, suitability of the terrain for construction, seismotectonic characteristics of the area, critical zones from a spatial planning perspective, planning and construction conditions for different terrain categories, and, ultimately, a digital graphical and textual database within a GIS environment.

Geophysical Surveys

Geophysical surveys are a set of methods used to investigate the composition, structure, and characteristics of the Earth’s crust without direct excavation or drilling. They are based on measuring physical properties of soil and rock, such as density, magnetism, electrical conductivity, and the propagation velocities of seismic waves through different lithological media.

The most commonly used methods include:

  • Seismic refraction
  • Seismic reflection
  • Seismic tomography
  • MASW (Multichannel Analysis of Surface Waves)
  • Geoelectric methods (e.g., VES, ERT)
  • Electromagnetic methods (e.g., TEM, VLF, CSAMT)
  • Ground Penetrating Radar (GPR)

Geophysical soil investigation methods have been applied to numerous infrastructure projects, including sections of highways and expressways such as the Nević Polje – Turbe expressway, Tuzla – Maoča highway, and the Mostar North – Mostar South motorway.

DETAILED DESIGNS FOR THE KLOPČE – DONJA GRAČANICA HIGHWAY SECTION

The total length of the Klopče – Donja Gračanica section is 5.8 km and features several significant structures: the first part of the route includes two viaducts (Klopče, Klopačke Stijene) and one tunnel (the artificial Klopče tunnel). The second half of the section is characterized by almost no open road; instead, it alternates between a total of three viaducts (Babina Rijeka, Pehare, and Ričice) and two mountain tunnels (Ričice and Pečuj).

Main Design of Temporary Roundabout at Energopetrol Turn – Industrial Zone, km 4+600, Municipality of Vogošća

The main design defines the configuration of the reconstructed intersection as a single-lane roundabout with an outer radius of R = 41.00 m. The location and layout of the designed roundabout are constrained by limiting factors present at the site of the existing intersection. These constraints include the proximity of the existing “Energopetrol” gas station, appropriate geometry of the roundabout arms, as well as an existing pedestrian underpass on the “Sarajevo” arm. The subject roundabout falls into the category of medium urban and medium rural single-lane roundabouts (with an outer radius between R = 35.0 m and R = 45.0 m), with a capacity ranging from 20,000 to 22,000 vehicles per day.

The design solution includes a single-lane roundabout with a radius of 20.5 m and four arms. The width of the traffic lane is 6.5 m, and the carriageway width intended for prefabricated traversable elements is 1.0 m.

Preliminary and Main Design of the Sanitary Sewer System for the Settlements of Karadaglije, Jablanica, and Tugovići in the Municipality of Tešanj, within the Highway Corridor Zone, Medakovo – Ozimice Section

As part of the sanitary sewer project in the municipality of Tešanj, the main sanitary sewer collector was designed with a length of 4,700 meters. Its route is aligned along existing or planned roads and follows the planned Trebačka River course, allowing collected wastewater to be conveyed by gravity flow to the planned wastewater treatment facility.

In addition to the main collector, secondary sanitary sewer collectors and lower-order collectors were designed (totaling 4,000 meters) that feed into the main collector. This design effectively addresses the sewage system needs of the Karadaglije, Jablanica, Tugovići settlements, as well as other individual properties.

Drainage and Watercourse Regulation as Part of the Preliminary and Main Design for the Orašje-Tuzla Highway, Section Tuzla-Maoča

The project for the Tuzla-Maoča highway section includes LOT 4a (10.04 km) and LOT 4b (2.5 km) with the following components:

LOT 4a (10.04 km)

  • External drainage of the main route, access, and local roads on the section;
  • Internal drainage and design of the water protection system for the main route, rest areas, and access roads;
  • Drainage of the Grabovac, Jasenica, Crveno Brdo, Podorašje bridges, as well as Majevica 1 and Majevica 2 bridges;
  • Drainage of the Majevica Tunnel, length 1,950.0 m;
  • Regulation of watercourses along the section, including the Jasenička River and other streams.

LOT 4b (2.5 km)

  • External drainage of the main route, Dubrave interchange, and access roads;
  • Internal drainage and design of the water protection system for the main route, Dubrave interchange, and access roads;
  • Drainage of the Dubrave 1 and Dubrave 2 bridges, as well as the Bare overpass;
  • Drainage of the Previle Tunnel, length 310.0 m;
  • Regulation of watercourses along the section, including the Tinja River, D. Potok and others.
Main Designs and Reports on Engineering Geological and Geotechnical Site Investigations for Railway Line 12 Bosanski Šamac – Sarajevo and Railway Line 14 Brčko – Banovići

The project aimed to find the most economical solution for landslide remediation, complying with technical regulations, by addressing drainage, construction of structural elements, track rehabilitation, cleaning of channels and culverts, screening of the protective prism, removal of grains smaller than Ø 31.5 mm to the landfill, supplementing the protective layer with new material, replacing damaged sleepers, track alignment, and restoring designed speeds on the rehabilitated sections. Landslide remediation projects were carried out at several locations:

Railway 12 Bosanski Šamac–Sarajevo, between Maglaj–Jelina stations

  1. Landslide remediation on Railway 12, section Maglaj–Zavidovići, km 122+900–123+020
  2. Landslide remediation on Railway 12, section Žepče–Nemila, km 162+200–280
  3. Landslide remediation on Railway 12, section Nemila–Jelina, km 168+500–600

 

Railway 12 Bosanski Šamac–Sarajevo, between Lašva–Alipašin Most stations

  1. Landslide remediation on Railway 12, section Lašva–Kakanj, km 196+500
  2. Landslide remediation on Railway 12, section Lašva–Kakanj, km 198+200–199+300
  3. Landslide remediation on Railway 12, section Lašva–Kakanj, km 200+580–650
  4. Landslide remediation on Railway 12, section Lašva–Kakanj, km 200+970
  5. Landslide remediation on Railway 12, section Lašva–Kakanj, km 203+950
  6. Landslide remediation on Railway 12, section Lašva–Kakanj, km 206+600

 

Railway 14 Brčko–Banovići, between Bosanska Bijela–Banovići stations

  1. Landslide remediation on Railway 14, section Bosanska Bijela–Špionica, km 78+980
  2. Construction of culvert on Railway 14, section Bosanska Bijela–Špionica, km 83+000
  3. Landslide remediation on Railway 14, section Tinja–Mramor, km 106+350–450
  4. Landslide remediation on Railway 14, section Tinja–Mramor, km 106+720
  5. Landslide remediation on Railway 14, section Tinja–Mramor, km 106+800–107+000
  6. Rehabilitation of the bridge approach cones and regulation of the riverbed and banks in the bridge zone on railway line 14, section Živinice–Banovići, at km 131+95
Detailed design VE Mesihovina, LOT 2: Construction of Access Roads and Crane Platforms

The entire section from the connection to M6.1 up to WF Mesihovina is divided into three subsections:

  • The first subsection up to km 6+150,
  • The second subsection from 6+150 to 12+050, including the branch to the transformer station,
  • The third subsection from 12+050 to 19+350, including branches to the wind turbines.

 

Before starting the Detailed Design, a Geotechnical executive study, namely mission G31, was prepared. The G31 mission, as a Geotechnical executive study, presented and recorded deviations of actual site conditions from those anticipated in the Main Design, and proposed adjustments and modifications to the design solution, which were fully respected during the preparation of the Detailed Design.

As part of this contract, the Detailed Design for crane platforms at the locations of all wind turbines (WT1 to WT22) was developed.

Regional Sanitary Waste Landfill "Separation 1", Živinice

Based on the proposed Program of Geological and Geotechnical Investigations and Testing for the needs of the G31 geotechnical mission for the regional landfill “Separation 1,” investigative works were carried out at the site between November 2020 and May 2021.

At the locations of future structures, exploratory trenches and dynamic probing using the medium-heavy Dynamic Probing Meter (DPM) were conducted, and exploratory drilling was performed within the landfill body area.

The G31 mission defined the foundation conditions for the planned structures, landfill body, as well as temporary and permanent roads.

PREPARATION OF THE PRELIMINARY AND MAIN DESIGN FOR THE MOTORWAY MOSTAR NORTH – MOSTAR SOUTH, Length 14.2 km (part of a consortium)

The engineering geological and hydrogeological investigative works along the route and structures included the following:

  • Detailed engineering geological and hydrogeological mapping of the terrain;
  • Exploratory drilling;
  • Geophysical surveys;
  • Installation of piezometer systems;
  • Presiometer testing;
  • PLT testing and other in situ tests;
  • Interpretation of investigation and testing results.
Main Design for the Repair of Road Settlement and Uplift, M17 Road, Blatuša Interchange, Zenica, Including an Engineering Geological and Geotechnical Site Characteristics Report. Post-Repair Monitoring

Measurement of horizontal soil displacements in installed inclinometer systems. Measurements were conducted using BRAIN MEMS inclinometer systems (Borehole Readout Array for Inclinometers) manufactured by SISGEO, Masate MI, Italy, with electronic data reading and analysis performed in KLION software.

Construction of the City Highway in Sarajevo

Conducting geophysical surveys along the highway route using the shallow seismic refraction method to determine the quality of the soil and embankments in the subgrade.

Consulting services for construction supervision – project: highway construction on Corridor Vc, section Poprikuše – Zenica North (Donja Gračanica), subsection Vranduk – Ponirak

Design&QC was engaged as the geotechnical supervision team member to ensure all geotechnical works are executed in accordance with the project technical documentation, applicable standards, and regulations.
The highway route subsection Vranduk – Ponirak is part of the Poprikuše – Zenica North (Donja Gračanica) section, which continues north to the Nemila – Vranduk subsection and south to the Ponirak – Vraca subsection. The total length of this section is 5.3 km.
A distinctive feature of the route is the horizontal and vertical separation of the left and right carriageways due to the highway running through very steep slopes. The highway is mostly built in a cut section, requiring a significant number of high retaining walls constructed using reinforced earth technology.

Supervision of the construction of the Svilaj border crossing – highway construction, Corridor Vc, Svilaj – Odžak section

The contract includes expert supervision services for the construction works at the Svilaj Border Crossing. Design&QC was engaged as the main coordinator in the supervision team, responsible for overseeing geotechnical works and road/traffic-related activities.

Construction Pit Support Project for the Residential and Commercial Pionirska Building (Buildings A, B, and C) in the Municipality of Centar Sarajevo

The contract included the preparation of a geotechnical project for securing the construction pit and reports on the engineering-geological and geomechanical characteristics of the site for the residential and commercial buildings on Midhata Karića Mitketa Street in Sarajevo. The construction pit was secured with piles of Ø800 mm diameter and active geotechnical anchors arranged in two rows, along with the construction of a reinforced concrete retaining wall and a wide excavation on the southeast side. The anchors were made of high-strength steel St 1550/1770, with steel cables 15.30 mm thick. The piles were connected with a reinforced concrete head beam, between which a reinforced concrete slab, waterproofing, and drainage concrete with D200 pipes for seepage water drainage were constructed. The northeast side was secured with piles and steel struts due to limited space, while the northwest side was executed as a wide excavation with a 1:1.5 slope.

Main Rehabilitation Project of the Retaining Wall on the M17 Main Road, 430m Before the “Ivan” Tunnel from the Donja Raštelica Direction

The project involves the reconstruction of the main road over a length of 75 meters, including the implementation of an appropriate surface drainage system and the rehabilitation of the retaining structure.

The stabilization of the subject section is achieved through support elements arranged in both horizontal and vertical directions. Cable anchors are installed through the body of the existing retaining wall. These anchors are prestressed and connected to the retaining wall body via reinforced concrete buttresses. The buttresses are supported by two rows of micropiles through a connecting reinforced concrete beam.

Main Designs for Landslide Remediation, Road M17_013, Section: Jablanica 1 – Potoci

The project included the preparation of main designs, geotechnical reports, and engineering-geological and geotechnical characteristics assessments for several locations:

  • Rehabilitation of the slope below the road profile, road M17_013, section: Jablanica 1 – Potoci, km 1+150
  • Landslide rehabilitation, road M17_013, section: Jablanica 1 – Potoci, km 2+450
  • Landslide rehabilitation, road M17_013, section: Jablanica 1 – Potoci, km 4+450
  • Rehabilitation of the foundation of the retaining wall and existing culvert, road M17_013, section: Jablanica 1 – Potoci, km 4+650
  • Rehabilitation of the slope below the road profile, road M17_013, section: Jablanica 1 – Potoci, km 4+950
Securing the Entrance and Exit Portals of Tunnel T2 as Part of the Works on the Lugoj-Deva (A1) Highway, Lot 2: km 27+620 - km 56+220 Section E and Completion of Section D, Romania

The project involves securing the entrance and exit portals of Tunnel T2. To ensure the stability of steep slopes and protect the highway from potential collapse of material from the cut slope or unstable steep embankments, the structure is designed as a tunnel gallery, a roughly monolithic reinforced concrete frame construction. The galleries are subjected to horizontal forces from soil pressure, which is why the construction of piles on both sides of the gallery is planned. The piles along the slope also act as retaining walls, built first to absorb soil forces and enable the subsequent construction of the gallery.

Preparation of the Detailed Design for the Rehabilitation of the Jasen Tunnel, in the settlement of Ustirama, on Road M16.2

The “Jasen” road tunnel is located on the main road M16.2 Bugojno – Jablanica, near the settlement of Ustirama, between km 57+756 and km 58+121. It was built in 1954/1955 and has a total length of 365 meters. Based on its position relative to the terrain configuration, the tunnel is classified as a hillside type.

The construction was carried out using the old Austrian method, with excavation chambers (technological working joints) measuring 6 meters each, while the tunnel lining consists of concrete blocks. However, the existing cross-section of the tunnel does not meet the requirements for the clearance profile. The Jablanica – Prozor road, built around 1960, was designed to closely follow the natural terrain configuration, allowing for significant cost reduction.

Due to concerns about the thickness of the tunnel lining and the condition of the rock mass behind it, the optimal solution chosen was to lower the tunnel profile by approximately 50 cm. This approach avoids complete removal of the existing lining and, depending on the extent of demolition, applies an appropriate underpinning system.

Main Design for Stormwater Drainage at Babin Do, Bjelašnica

The drainage system covers the Babin Do plateau, including the parking area, access roads, and plateaus. The project includes a closed drainage system with treatment via an oil and light liquids separator, as well as the design of an additional concrete sedimentation tank. This is necessary because the treated water is reused for snowmaking on the ski slopes.

Main Design of the Pipeline and Pump Station as Part of the Expansion of the Artificial Snowmaking System, Design and Build Project, Bjelašnica Ski Resort

The expansion of the existing snowmaking system includes extending the pipeline network for snowmaking, installing inspection chambers for artificial snowmaking, and installing snow guns. The artificial snowmaking system expansion involves:

  • construction of approximately 9,000 meters of pipeline with diameters ranging from DN300 to DN80, pressure ratings from PN40 to PN100;
  • installation of 97 inspection chambers and snow guns for snowmaking.
Main Detailed Design for the Construction of a Protective Barrier on Regional Road R413: Turbe – Vitovlje – Skender Vakuf, at km 16+940, Length 40m (Slope Rehabilitation)

The slope rehabilitation included protection of the lower part of the slope against erosion and support of stone blocks with reinforced concrete buttresses.

Reconstruction of a Four-Way Intersection into a Roundabout: M17/R953 – Lužansko Polje – IV Viteške Brigade

The roundabout connects the streets M17/R953, Lužansko Polje, and IV Viteške Brigade. This four-leg intersection is classified as a medium-sized roundabout with an outer diameter of 50.00 meters, corresponding to an outer edge radius of 25.00 meters and an inner radius of 16.00 meters. The circulating lane on the inner radius is designed with a width of 2.00 meters, while the overall width of the circular roadway is 9.00 meters.

Traffic flow is ensured for the reference vehicle — a truck with a trailer. Pedestrian pathways are designed primarily in the same locations as existing ones, with a width of 1.60 m, except in areas where adjustments were made to connect with the existing pedestrian pathways, resulting in slightly narrower or more frequently wider sections. The geometric design elements of the intersection arms have been optimized to match the existing alignment, both horizontally and vertically.

Main Design for the Reconstruction of Husino Intersection, Main Road M-18, Section (006) Šićki Brod 3 – Živinice 1

The main design includes the reconstruction of the intersection, adopting a modified single-lane roundabout configuration. The solution consists of two circular segments with an outer diameter of 33 m, each featuring a 6 m wide carriageway and a 1.50 m wide traversable strip. These segments are interconnected by a continuous 6 m wide roadway.

Slope Rehabilitation for the Treševine Cut – Right Side of the Cut, LOT 3a Section of the Sarajevo Bypass

Within Mission G31, the rehabilitation project for the right side of the Treševine cut was developed. To ensure effective landslide rehabilitation, certain securing measures were implemented. The proposed solution included a design using shotcrete and anchors, securing both the rock wedge and the lower part of the slope above the rock wedge.

Preparation of the Revised Main Design: Putnikovo Brdo–Karuše and Karuše–Medakovo Sections, Length: 8.5 km

The project included a modification of the main design for the motorway section from station km 6+500 to km 8+540, including the Medakovo interchange, the access road to the Traffic Control and Maintenance Center (COKP), the Čostovići overpass, the Medakovo overpass, the PP5 underpass, the bridge over the regulated Tešanjka River bed, the hydraulic structure HO8, retaining structures, reinforced earth structures, slope stabilization, internal and external drainage along the alignment and on structures, and the regulation of the Tešanjka River.

The modification of the main design for the motorway section from station km 1+120 to km 2+040 included the Usora interchange, the R2 roundabout, and the Kraševo roundabout on the realigned main road M4.

Underpass PP5 and bridge on the access road to COKP (as-built condition)

Preparation of the Revised Main Design: Sections Putnikovo Brdo–Karuše and Karuše–Medakovo, Length: 8.5 km

The project included a modification of the main design for the motorway section from station km 6+500 to km 8+540, including the Medakovo interchange, the access road to the Traffic Control and Maintenance Center (COKP), the Čostovići overpass, the Medakovo overpass, the PP5 underpass, the bridge over the regulated Tešanjka River bed, the hydraulic structure HO8, retaining structures, reinforced earth structures, slope stabilization, internal and external drainage along the alignment and on structures, and the regulation of the Tešanjka River.

The modification of the main design for the motorway section from station km 1+120 to km 2+040 included the Usora interchange, the R2 roundabout, and the Kraševo roundabout on the realigned main road M4.

 

MEDAKOVO OVERPASS (As-Built Condition and Design Solution)

Preparation of the Revised Main Design: Putnikovo Brdo–Karuše and Karuše–Medakovo Sections, Length: 8.5 km

The project included a modification of the main design for the motorway section from station km 6+500 to km 8+540, including the Medakovo interchange, the access road to the Traffic Control and Maintenance Center (COKP), the Čostovići overpass, the Medakovo overpass, the PP5 underpass, the bridge over the regulated Tešanjka River bed, the hydraulic structure HO8, retaining structures, reinforced earth structures, slope stabilization, internal and external drainage along the alignment and on structures, and the regulation of the Tešanjka River.

 

The modification of the main design for the motorway section from station km 1+120 to km 2+040 included the Usora interchange, the R2 roundabout, and the Kraševo roundabout on the realigned main road M4.

Čostovići Bridge (As-Built Condition and Design Solution)

Modification of the Main Design for the Motorway on Corridor Vc, Section: Tarčin–Konjic, LOT 1, Subsection: Tarčin – Ivan Tunnel Entrance

The length of LOT 1, Tarčin – entrance to the Ivan Tunnel, is 4.9 km. This subsection starts at the end of the Lepenica – Tarčin section, immediately after the Tarčin interchange. In the initial part of this motorway alignment, from the tie-in point with the preceding section to the beginning of bridge M1 – Raštelica 1 (L = 518 m), over a length of approximately 1,200 m, the alignment is situated on high embankments constructed with reinforced earth structures.

After this sector, the alignment crosses to the opposite slope via the Raštelica 1 bridge. The bridge spans over the main road M17 and the Kalašnica River. It consists of 13 spans. Due to spatial constraints, a Type 1 rest area (rest stop without service facilities) is planned. Following the left-side rest area, the alignment continues over bridge M2 – Raštelica 2 (L = 589 m), which spans the main road and a wider valley, and therefore comprises 19 spans. The right-side rest area, along with the entry and exit ramps, is located from approximately the beginning of bridge M2 up to the entrance to the Ivan Tunnel.

PRELIMINARY AND MAIN DESIGN OF THE MOTORWAY SECTION MOSTAR NORTH – MOSTAR SOUTH, Length: 14.2 km (part of a consortium)

The company Design&QC d.o.o. Sarajevo, as a member of the consortium, was responsible for preparing the following phases of the design documentation:

  • Relocated and newly designed local roads (total length approx. 9 km)
  • Site investigations and engineering-geological studies
  • Geotechnical designs
  • Regulation of the Sušica stream over a length of 4 km
  • External drainage for the relocated roads
  • Construction material disposal site designs
  • Structural designs, including:
  • Retaining structures (total length: 435m)
  • 1 bridge (total length: 319 m)
  • 1 twin-tube tunnel (lengths: 720 m + 700 m)
  • 1 box culvert
  • 1 overpass
Hranjen Tunnel Project, Expressway Hrenovica–Hranjen–Goražde – The Longest Designed Tunnel in Bosnia and Herzegovina

The project includes a twin-tube tunnel:

The length of the main tunnel tube is 5,557.28 meters (this includes the lengths of the entrance and exit galleries),

The length of the service tunnel tube is 5,521.98 meters (including the length of the exit gallery).

Main Design for the New Odžak Interchange and Access Road, Section Svilaj–Odžak

Section Svilaj – Odžak from km 10+020 to km 10+762.5, including the access road to the main road M14.1. The project includes the Odžak interchange (trumpet-type junction), an access road approximately 4.1 km long, as well as the connection to the main road M14.1 with a roundabout.

PREPARATION (AMENDMENT) OF THE CONCEPTUAL AND MAIN DESIGN FOR THE ORAŠJE–TUZLA MOTORWAY, section Tuzla–Maoča (LOT 4 connection with LOT 3 – Čanići) (part of a consortium)

The preparation (amendment) of the conceptual and main design for the Orašje–Tuzla motorway, section Tuzla–Maoča (LOT 4, connection with LOT 3 – Čanići), includes:

  • Design of the motorway route with a total length of 12.51 km
  • Design of relocated and new local roads
  • Exploratory works and engineering-geological studies
  • Geotechnical design
  • Internal and external drainage system design
  • Water protection systems
  • River regulation projects
  • Construction material disposal site design
  • Landslide remediation projects
  • Structural design, including:
    • Retaining structures (total length 2,972.2 m)
    • Two twin-tube tunnels (total length 4,551.5 m)
    • 17 bridges (total length 3,099 m)
    • 5 underpasses
    • 1 overpass
  • Supporting Documents for Approval Procedures
Expressway Nević Polje – Turbe (part of consortium)

This contract includes the preparation of all phases of the main design for the route and structures of the Nević Polje – Travnik – Turbe expressway (length 12.5 km). This section is part of the planned Lašva – Nević Polje – Jajce expressway. The planned expressway will connect central Bosnia and Herzegovina with the highway on Corridor 5c near the Lučani (Lašva) interchange, representing the most important traffic route for the Federation of Bosnia and Herzegovina in the west-east direction. This section is part of the TEN-T Core Network international route E-761 (Bihać – B. Petrovac – Jajce) and the setto network section 2a Okučani (Republic of Croatia) – Banja Luka – Travnik – Lašva. The construction of this new “expressway” class road will significantly improve traffic conditions along the Sarajevo – Banja Luka corridor.

Design&QC d.o.o. Sarajevo, as a member of the consortium, was responsible for preparing the following project documentation phases:

  • Travnik Interchange (Turbe)
  • Roundabout below Travnik Interchange
  • Roundabout on M5
  • Three-leg junction with a left-turn lane on M5
  • Relocated and local roads
  • Landfill and borrow pit project
  • Report on engineering-geological and geotechnical soil characteristics
  • Geotechnical projects (G21 missions)

TURBE BRIDGE (3D structural model and longitudinal profile)

Motorway Section Tarčin – Bradina, Modification of the Main Design and Detailed Design of the Road Crossing (RC) Bradina

The project involved the preparation of the main design for the connecting road of the temporary junction of the M17 main road to the Corridor Vc, including a temporary side toll station (STS) in the wider area of Bradina settlement. This project is actually a modification of the existing main design prepared in July 2018. The reason for the modification is the request from the Client, JP Autoceste FBiH, for the expansion of the temporary side toll station. The previous main design planned 4 lanes (2 entrances and 2 exits) for the STS, while this project foresees 6 lanes (3 entrances and 3 exits). Additionally, this project includes corrections at the very beginning of the connecting road due to changes from the detailed design of the roundabout, which actually represents the connection with the existing M17 main road.

Professional Supervision

This unit provides professional and technical supervision services during construction works, ensuring that all work is carried out in accordance with project designs, legal regulations and technical standards.

Geology and Hydrogeology

This organizational unit provides expert services in the fields of engineering geology and hydrogeology, including investigative works, geophysical and other in situ tests necessary for the preparation of geomechanical reports, geological risk analysis, terrain stability assessment, as well as safe and efficient planning of construction projects. Hydrogeological activities include detailed groundwater investigations and the preparation of hydrogeological studies and reports, which serve as the basis for sustainable water resource management.

GEOLOGY / HYDROGEOLOGY includes:

  • Engineering geological investigations
  • Hydrogeological investigations
  • Exploratory drilling
  • Geophysical testing
  • Other field (in situ) tests

Hydrotechnical Projects

This organizational unit is engaged in the development of design solutions in the field of:

  • Regulation and management of open watercourses with hydrological flood analyses;
  • Water supply systems for settlements;
  • Sewerage systems for settlements;
  • External drainage of highways, main roads, and other traffic routes;
  • Internal drainage and purification systems for highways, main roads, and other traffic routes;
  • Drainage of bridges and viaducts;
  • Drainage of tunnels, water supply, and fire protection networks in tunnels;
  • Snowmaking systems for ski slopes and pumping stations;
  • Preparation of investment-technical documentation for obtaining water permits;
  • Communal and other water infrastructure.

Geotechnical Engineering

The organizational unit for geotechnical analysis and design solutions focuses on:

  • Projects for routes and engineering structures — tunnels, bridges, viaducts, culverts, excavation pits, retaining structures,
  • Stabilization of landslides and rockfalls,
  • Design of excavation pits, culverts, and retaining structures,
  • Load-bearing capacity analysis and ground foundation reinforcement.

Structures (Engineering Structures)

This organizational unit is engaged in the design of various types of engineering structures, such as:

  • Bridges, viaducts, tunnels,
  • Interchanges, overpasses and underpasses,
  • Retaining structures,
  • Vertical transportation systems.

Road Infrastructure (Civil Engineering)

This organizational unit focuses on the design of transportation infrastructure of various categories, including:

  • Highways,
  • Main, regional, and local roads,
  • Urban streets and intersections.


The work is centered on designing traffic solutions in accordance with technical standards, emphasizing functionality, safety and durability.